Saturday, 13 November 2010

building 4 almost done



i'm thinking this building will be used more as background filler than anything but i may have in the fore ground as a brothel type building as it just has that vibe to me. i'm going to make both the front and back of the building both look as though they could be the main entrance that way i can rotate the building and have 2 different buildings in 1 model

building 3 done




and the shop is completed 1 more generic building to make then thats all for scene 1 done.

Tuesday, 9 November 2010

i guess i'll call it the shop




so heres the 3rd building for the 1st scene as always its in need of alot of work but you can see the basic shape and it'll be finished by the end of the week.

Monday, 8 November 2010

were going down the pub



heres the finished mesh of the pub 2 more buildingsto go and the 1st scene only need smaller meshes built

a monster truck?????? really?

unfortunately i couldnt get any pics but sat in the office today and what turns up a damned monster truck all dolled up in motorstorm stickers i'm guessing its for the ad campaign.

damn cool stuff though not everyday you get to say a monster truck turned up to work.

Sunday, 7 November 2010

close the bloody windows


update on the main building for scene 1, just need to finish the windows and build the door then its done and its on to a few smaller buildings. hoping to have all base meshes for the 1st scene ready to take in friday morning to show dean and stas.

i'm saying a week for each scene on base meshes but then again the 2nd and 3rd scene the buildings are basically all the same so the 3rd scene might only take a day or so to build the base meshes.

once everything is built i will unwrap everything and export to mudbox scene by scene to create normal maps.

lets go down the pub


heres the main building for the 1st scene, i might still make it a bit bigger as at the moment its only
512x256 on the ground level so thinking maybe 768x512. obviously a lot of work still needed to be done but shouldnt take too long.