Sunday, 7 November 2010

close the bloody windows


update on the main building for scene 1, just need to finish the windows and build the door then its done and its on to a few smaller buildings. hoping to have all base meshes for the 1st scene ready to take in friday morning to show dean and stas.

i'm saying a week for each scene on base meshes but then again the 2nd and 3rd scene the buildings are basically all the same so the 3rd scene might only take a day or so to build the base meshes.

once everything is built i will unwrap everything and export to mudbox scene by scene to create normal maps.

1 comment:

  1. get the swords and sheilds it's time for a fooooight!

    ReplyDelete